We are open!!  When planning your visit to the PID office please wear your mask, maintain physical distance and stay home if you are sick. Visit our Covid-19 response page for more info.  Our number one priority is the health and safety of our customers and employees and we thank you for your continued cooperation. For online bill payment and inquiry services click here.

 Water Quality Advisory Lifted for Surviving Homes & Completed Construction: Updated May 20, 2020

This is a public works project. The Project contemplated consists of the installation of approximately 4,500 metered service connections, including meters, meter boxes, backflow prevention assemblies, and all related appurtenances to support the return of metered potable water service to the Paradise Irrigation District (PID, or DISTRICT).

Additionally, the project includes the replacement of up to 1,750 service laterals including service saddles, piping, and angle stops as well as all related fittings and materials required for backflow and surface restoration. The Project is intended to support rebuilding efforts following the Camp Fire of November 2018 and as a result will be structured to address locations based on community needs.

Date Issued: March 26, 2020

Deadline: May 7, 2021 - 2:00 p.m.

Proposal Responses: The District must receive responses to this RFP no later than May 7, 2021 by 2:00 PM. Proposals received after the due date will not be accepted. No additional time will be granted to any consultant unless by addendum to this RFP. Consultants must submit four (4) originals with signatures, and one (1) electronic PDF version on a flash drive to the following
address:

Georgeanna Borrayo, District Secretary
6332 Clark Road
Paradise, CA 95969-4146
Ph: 530-876-2039
Fax: 530-876-0483

 

A mandatory pre-bid conference is scheduled between ENGINEER, PARADISE IRRIGATION DISTRICT and interested bidders on Wednesday, April 21, 2021 at 10:00 am. Interested bidders should meet at the Paradise Irrigation District Office parking lot, located at 6332 Clark Rd, Paradise, CA 95969, at which time the project will be reviewed. The meeting will be held outside with masking, social distancing, and any other current health and safety recommendations of the State of California observed. In the event of weather, the meeting may be moved inside at the District’s discretion. All interested bidders are required to attend.

Inquiries & Questions: Colleen Boak, PE, Water Works Engineers - This email address is being protected from spambots. You need JavaScript enabled to view it.

Documents: 

pdf Meter Installation & Service Lateral Phase 2 Project (5.66 MB)