Project Description - On hold due to budgetary constraints

PID’S Skyway water main in the A Zone from Clark Road to near the B Reservoir includes 4-inch, 5-inch, 6-inch and 8-inch steel main. This project replaces and upgrades 4,950 feet of that old steel main with 12-inch C900 PVC water main.

The A Zone main needs strengthening to properly benefit from the treatment plant's A Zone supply in case of emergency or when the 42-inch transmission line has a planned maintenance outage.

 

Original Spending Plan (dates postponed)

 Project Phase Previous Fiscal Year Expenses  Fiscal Year 16/17  Fiscal Year 17/18  Fiscal Year 18/19  Fiscal Year 19/20  Fiscal Year 20/21 Total
 Planning  -   -   -  -  $30,000  -  $30,000
 Design -  -   -  - $55,000 - $55,000
 Construction  -   -   -   -   -  $1,115,000 $1,115,000
 Total - - - - $85,000 $1,115,000 $1,205,000

Project Manager

Funding Source

Project Status

 on hold icon On hold due to budgetary constraints

PID's board considered these alternatives:

Option 1: PID crews construct the project.
Option 2: PID contracts with an outside firm specializing in this type of project.

The PID board approved Option 2 as presented in the 2017/2018 budget.

 

Benefits to PID and its Customers

This project will benefit flow along upper Skyway and adjoining streets and support water deliveries throughout the PID system in the event of failure or planned outage of the 42-inch transmission pipeline. Fire flows will be improved.

Anticipated Project Timeline

 
Concept Approval

Planning
design icon
Design
construction icon
Construction
completed icon
Completion
July 2017 on hold on hold on hold -

 

Project details updated November 2017